Abstract:
Globally, delay in construction projects is one of the most common, costly, complex and risky
problems encountered in construction projects success. This study was conducted with the main
objective of identify the factors affecting project success in building construction in Holeta town,
West Shoa Zone, Oromia Regional State, Ethiopia. The researcher has been applied Project
performance success as dependent variable and; management process factors, project fund,
project control, External integration factors and Internal integration factors as independent
variables. The study was conducted at construction building in Holeta town, West Shoa Zone,
Oromia Regional State, Ethiopia, purposively sampling technique. Using proportional random
sampling technique, 250 samples are drawn from 662 total populations. (Project performance
success). By taking the research objectives and questions into considerations, as the research
approach is quantitative and quantitative research as well as Descriptive and explanatory
research design used for in this study. Quantitative of this research method was used through
survey questionnaires which were constructed in 5-point Likert scales and distributed obtain
primary data from managers/supportive staff, office Engineer, and others employees Holeta
Town. The qualitative research method would be used through document review and semi structured interview. Data collected through, unstructured questionaries’ and analyzed data
using SPSS version 20. Then, LRM regressions model was applied after the data sets were
transformed to natural log form. The finding of the study shows that that management process
factors, project fund, project control, External integration factors and Internal integration
factors the independent variables have a strong positive relationship with project performance
success. Based on the finding the study recommended that the Holeta town has to give more
emphasis to project control to perform the construction building at a given time, appropriate
quality and balanced cost.
In this context several researchers have been conducted the factors affecting project success
building construction in different study. Therefore, the researcher motive is fill this gab by the
factors affecting the project success building construction specifically extent to management
process, internal factor and external factors that effect of the project success building to measure
in (time, cost and quality) a case study of Holeta building construction projects in Ethiopia